And back to a job that both Mike and I hate, lol. It is messy and very time consuming. This time we got a cool new gadget to make it a little easier on ourselves:)
Our new drywall lift:
Very cool. Now I don't have to hold it up with my hand and Mike with his head while he screws in the drywall screws:
Measuring and cutting the drywall to fit around the window
Next up is the bathroom area. Cement board for the future tile:
The fan and ducting is complete.
The office/living area has ben spackled and sanded. Amazing how fast that was, lol. The drying time is killer.
And back to the bathroom.
Lovely outfit for sanding, lol.
And the last room for us to do at the moment. The laundry/utility room.
Mixing the drywall compound(spackle)
Let it all dry, sand, redo and dry again before painting.
Well that was a very fast catch up. Who wants to see tons of pictures on that job, lol. It's kind of boring, very tedious and time consuming, lol. Next up....time to paint, install the toilet, vanity and do the flooring.
Glad to see you back! I love watching your projects!
ReplyDelete