Thursday, April 30, 2020

Making An Office And Bathroom Inside The Barn/Building

Good morning.  After 2 years I think I need to catch up.  So let's go back in time to when we started building on this Florida property.  We have approval for a barn with an office so that is our first step.

Let's get to the office part and then Mike and I can move out of the van:)

First step is to build the walls for the rooms.


One main area and a bathroom and closet.


Mike running the electric wire through the studs on the walls.



Getting the 2x4(studs) in place to hold the plumbing for the tub.


Ah...and Lisa's favorite job, lol.  Yes I am strange.



I do the insulation while Mike does the all the electric and plumbing.



Mike running the Pex(water lines) through the walls and ceiling.


Vent pipe for the future washing machine.



Installing a bathroom fan.



Success:)  Mike testing to make sure the water works and there are no leaks.




 Hot and Cold water lines are in for the washer.


And the venting out through the ceiling and roof.



I did the all the pipe insulation.  I've liked that job since the time Mike and I built our first house together back in 1999:)



Ok so this was short and sweet.  I have a lot of mixed pictures to go through and organize.  We are building a farm and a life here.  I will post again tomorrow morning and then every few days or so until we are caught up.

Stay tuned there are a lot of fun adventures and pictures coming up:)