Finally after all of the drywall has been sanded, re spackled, sanded again and dried it's time to paint. As usual Mike does all the rolling and I do all of the cut in.
A little help to get things dry:)
We picked out a large porcelain tile for the tub surround. Mike is cutting it using his cut off wheel.
Taped up so it doesn't fall off the wall while the mortar/thinset dries.
Finished:)
Next up the flooring. We chose a darker wood grained Luxury vinyl tile that is waterproof. This one was super easy to install. I did the installation and Mike did al of the cuts for me:)
It was super easy and fast to install:)
Next up the bathroom.
Mike working on the plumbing underneath the sink:
Nice and clean. There is nothing quite like a brand new bathroom:)
The lighting is in:
That's all for today. Tomorrow's story will be about the air conditioner we chose and the installation of it.