Showing posts with label Electrical. Show all posts
Showing posts with label Electrical. Show all posts

Friday, August 23, 2013

Chapter 164....The First Shelf Unit and Electrical At The Store


Chapter 164...Shelves and Electrical For The Store

I know it has been a long time but life has taken a change for the good and Mike and I are excited about our new upcoming project.  But back to the store for now.  We are in no rush to "finish" the store as this was really just something for us to do while increasing the value of our land.


Let me tell you about us getting the first shelves built and installed in the store.  We built the boxes and painted them at the house.  Today we are taking them to the store:



We laid out the "boxes" and attached the legs.  Mike is screwing the legs on:



A little awkward but Mike is almost done with our first shelf unit:



After we get them screwed together, Mike and I stand it up together and put it against the wall:

A little spackle, some more paint and they will look great:)



Next it's time for Mike to work on the electrical outlets.  We had to wait until after the sheetrock was done before Mike could do this.  Mike pulls out the wires to start wiring:



He strips off the extra wire casing so he can work with the actual wire:



Stripping tool for taking off the outer wire coating:




Wires are now stripped and ready to be installed into an outlet:




Mike uses the easy outlets which lets you plug in the wires:




One outlet is almost wired up.  Only about 20 more to go:




Putting the copper ground wire on:




More shelving ready to be put together:



Mike working on our overhead lights.  We did have a problem with the shop lights and we thought they were defective.  They were not.  Here is an FYI about fluorescent lights.  We were testing the lights and plugged them into a ground fault receptacle which kept tripping the line and the lights would go out.  We thought it was the light but it turned out to be the receptacle.  There is something about ground fault receptacles and fluorescent lights that don't mix.  Plugged into a regular receptacle and the light works fine.  We also had no trouble using compressors and all other tools on that same ground fault receptacle.  Just the fluorescent lights had a problem.



And the electrical box getting organized:



While Mike works on all the electrical I work on painting the floor trim:



And more:



The inside of the store is really coming together.  It won't be much longer before we are done.  Then we will have to finish the outside.


Sorry this on is short and sweet.  That's all for now and I will keep you posted on our progress everywhere:)



Monday, July 1, 2013

Chapter 160...Insulation My Favorite:):)



Mike and I are getting ready for the sheetrock crew.  He needs to get any extra studs installed and finish up the electrical.  While Mike works on that I will insulate all the walls and the ceiling:).  I am a strange one but I really like that job.



The wiring that Mike has to finish.  Once he gets that done I will install the insulation:)


Mike adding more wood to nail the drywall to:



From underneath:



I'm working my way around the building.  Here I am adding insulation behind the electric wires:



The walls are done:






Mike got the shower base in place:



Mike nailing the bathroom wall studs to the back wall:



Mike has the bathroom wall up, the electric wires and switch box in place:




Now that the walls are done I need to do the ceiling.  Mike came over to help me but I figured out a way of dong it myself so he can work on things I can't do.  It is a little awkward:



But I got it:)  Here I am stapling the paper from the insulation into the trusses.  Mike watched a TV show and told me how to do it differently.  Years ago we used to staple the paper to the bottom of the truss which caused problems for the drywall crew.  Now I push the insulation a little higher and staple it  to the sides above where the ceiling will be installed.  No staples are on the bottom of the trusses:



I use ladders to hold the insulation in place and walk the one end up to start stapling.  I did lose the strip of insulation a few times but for the most part it works well:



Slow and steady:


Mike getting all of the electric wires down from the ceiling and into the breaker box:



Ooh....I'm getting closer:



Cutting the insulation to fit:



Up on one ladder while the second ladder holds the other end in place:



Reaching over to staple the middle and then the other end:



I can't do the ceilings in the utility room and bathroom until Mike finishes with the lights.  We also need to order more insulation for me to finish the walls.  It is has been a good couple of days.

That's all for now.  I hope you enjoyed this story and I will write again soon:)

Monday, June 24, 2013

Chapter 159...Eaves, Electrical And Building Interior Walls

Hello everyone.  Today's chapter is about getting the eaves cut, painted and installed, working on the electrical wiring inside the store, and building the walls for the bathroom and utility room.

So let's get to work:)


We are using the extra T1-11 for the eaves.  The eaves are the lower edge of the roof.  We use the saw horses to measure and cut the boards.

Mike is measuring:



After we get some of the eaves cut I get them painted:



I ran out of room on the saw horses so I set up some cross boards and started painting the eaves inside the building:



Mike starts working on the electric inside the store.  He is nailing in the electric outlet boxes every eight feet:



Once the boxes are in he starts the wiring:



Drilling a hole in the top of the wall so we can feed the electric wire above the trusses and over to the electrical panel box:



Mike pulling the wires over to the utility closet:



Drilling holes into the sides of the walls to make room for the wires.  Every stud needs a hole drilled:



More boxes being nailed in:




Feeding the electric wire into the circuit breaker box:




Mike wires the outlets for our overhead lights:



I nail in metal plate covers on every stud to protect the electric wire.  This needs to be done so that no nails or screws go through the electric wire when the sheetrock is installed:




Yay...another delivery.  My insulation is here....my favorite job:).  We also go some more 2x4's for the interior walls:



We empty the building and then we refill it, lol:



We alos have to make shelves for the store.  We will be making them out of plywood.  Mike measures for each shelf:



Cutting them down to size for 16 inch shelves:




Bringing them inside and stacking them until we are ready to paint and build them:



Here are our stacks of shelves and eaves that we will get back to.  Right now Mike needs my help building the walls for the bathroom and the utility closet:




Mike measures the 2x4's for the top plate for the wall:



Once the 2x4's are cut down we lay them out and get ready to nail them together.  We use pressure treated 2x4's for the bottom plate which will sit on the concrete floor and regular 2x4's for the rest of the wall.



Once we get a section of wall done, we stand it up and anchor it into the ground:



Mike trying to get our section straight:



Nailing the section of interior wall to the inside of the truss:



We have rooms:)  The bathroom and the utility room studs are up:



Now it's time to install the eaves that have already been painted and are dry.  Mike nails the first one in place on the back of the building:


Moving along:



And we are done:



That's all for now.  Mike and I are happy with the progress.  Next time I will tell you about my insulation job and Mike will finish up the electrical wiring and do the plumbing.

I hope you enjoyed the story and have a great week:)