Mike using the post hole driver to pound in the ground rod for the store:
Next he drills a hole to bring the wire into the building by our electrical box:
And now to the inside:)
Mike installing the trim that I painted:
Nailing the bathroom door kit in place:
Mike installing our lights:
And back to our shelves. Putting them together on the floor and screwing the bases to the legs:
The front legs going on:
And we have the second shelf standing. Mike making sure it is all screwed together:
The third shelf almost screwed together:
After we get the shelves up we decided they don't look good enough. Mike uses spackle to fill in any holes and splits in the wood:
Once the spackle is dry I sand the shelves to make a smooth surface then I repaint them:
Mike working on the last of the ceiling lights:
Time to build the counter. We checked online and in our local stores to see about buying one but they were just too expensive. For this simple counter we are using 2x4's, plywood and a sheet of siding that has been cut done to size:
We measure the 2x4's and cut them to be part of the base and the top of our new counter:
Niki making sure we do things right:)
Mike nailing the cut piece of plywood to the top of the 2x4 base:
Once the plywood is nailed onto both the top and the bottom section we cut a square out each corner on the bottom of the base and nail in the 2x4's:
Almost done:
Mike nailing in the front of the counter using siding:
After we get that together on the driveway, we load it onto the trailer and take it to the store. Mike nails the end of the counter on:
Ahh....me painting more trim:
It's starting to come together:
The counter has been trimmed and painted:
Mike's daughter gave us some old shelves that we decided to put down the middle of the store:
As you can see we have been slowly bringing some things down to the store. We have decided to open next year as we really don't have a lot to sell. Over the winter we will look for some bargains:)
That's all for now and I will write again soon.