Showing posts with label Snow. Show all posts
Showing posts with label Snow. Show all posts

Tuesday, February 19, 2013

Chapter 51...We Hit The Mailbox & Replacing Gates

Off Grid...Chapter 51

It is a great morning and I have a "real story" to tell. Woo hoo.

Monday 3-2
We woke up to beautiful blue skies and 10 inches of snow on the ground. I can't believe that was only last week. First thing that morning Mike went up to clean off our solar panels. After that I went outside to clear a path for the "princess Niki". She will not go outside in the snow. We have to literally throw her outside and close the door. Pitiful.

Next I went up top and took a couple of beautiful pictures. Here is one of all the snow and the blue skies.

Another of the mountains.

Later that day Nicole called and said the neighborhood lost power for a couple of hours. Mike and I are really in our own little world up here. We had no idea the power went out which for us is really awesome.

Tuesday- It is sunny out and we are stranded.

Wednesday- Still stranded.

Thursday 3-6
Woo hoo. It's break out time. We are fearlessly, well Mike is, headed down our driveway and going to town. It's about time. We went bowling just for a little exercise, lol. We were terrible but we had fun. Next we went to Lowe's and while I was drooling over all the spring gardening supplies Mike bought stuff to make our air vent. After that groceries and home.

Friday 3-7
It is a much warmer day. Mike started working on the fresh air vent for the Fireplace. He already installed the one on the inside of the house but it has taken awhile to come up with one for the outside. You can't just walk into a store and find these things. He decided to go with a thin dryer vent and he added some screen to it to keep any small "critters" out.

Just checking to make sure the location is right.

Drilling the first hole so he can get the jigsaw blade in.

Using the jigsaw to cut the hole "to size".

After he gets that hole cut and out Mike has to cut the insulation out.

Putting the vent on. Now we just have to paint it.

Here is the vent from the inside. Now we finally have a fresh air vent that works for the propane and the fireplace. Just in time for Spring when we won't need it, lol.

Saturday 3-7
Oh what a beautiful day. I'm going to have to hold Mike back so he doesn't kill us today. This is the day we have been waiting for. Woo hoo. First we have to stop at David's, the Farm Supply, to pick up some supplies. We picked up a couple of poles. One for the mailbox that Mike ran into and one for the entrance gate. We also got some quick mix concrete and I got peat moss and coarse vermiculite for my garden. Yippee, it's almost time for gardening. I can't wait.

When we got back home the front gate was open which means Howard is inside feeding the cows. We pulled in and Howard and his friend, Norman, were by the barn so we stopped and talked for awhile. Everyone is feeling good today because it is warm and sunny. Howard and Norman helped Mike and I get the vermiculite and pea moss into the barn. Who knew 1 bag of peat moss was so heavy?

Howard was worried about us. He said he didn't see any tire tracks from the house all week. Mike said "I told you Lisa and I don't come out when it is cold" and he wasn't kidding, lol. Now when the warm weather breaks we will bust our butts.

We are hoping the cows will have babies in April. I hope Mike and I can watch at least one of them giving birth. If that happens I will get pictures. I can't wait.

Next Mike and I went up to the house to load up the trailer with tools and supplies to first go work on our mailbox. It's amazing how many tools are needed for such a small job. I took the jeep and trailer down and Mike followed with the tractor. I need to learn how to drive the tractor this year.
Here is the mailbox we hit.

First we started digging out around the bottom of the pole. Then we attached a chain to the pole and around the tractor to pull it out.

We tried to pull it out but it isn't budging. I told Mike "I think we put concrete in this hole". We dug out more and wiggled some more. Finally we got it out and there was no concrete. It was buried from the road shale. Yeah, we got it out.

Next we get out the chainsaw and Mike cuts down the new pole.

We put the pole in the ground and I go down to the creek and get a bucket of water. Mike starts pouring in the concrete mix while I add the water. Here I am tamping down the concrete mix.

And the new mailbox is finished.

Next on our list is to work on the gate to the barn(at least one side). For years and years there has been a gate and a corral gate across the entrance to the barn. It is held there by lots of rope and a couple of chains. So anytime you have to get into the barn you have to climb over the gate. Mike and I are going to undo the 2 gates, get rid of any wood and debris, and install bolts so the gate can swing open.

This is what it looked like originally.

We got both gates down and now Mike is pulling out some wood.



Twisting the first bolt in.

We put the second bolt in and installed the gate. Now it swings open. I pounded a small piece of rebar into the ground to keep the gate form swinging too hard.

Much better.

After that we went up to the house for lunch and a break. Mike says "let's go, we can do another job". And this is how our life is when it is nice out. So down we go to the front gate. Remember way back we tried to install a new front gate and we hit rock? Well we just left it for a nicer day and that day is here. We took our new gate off the new pole. Then we took the old gate out. Next we took off the barbed wire that was on the old pole. We are going to take the old pole out of the ground using the tractor and install the "new" pole into the same hole.

Here is the new pole in the old hole.

Then we installed the bolts into that pole and hung the gate.

Next I had to go out to the road to turn the jeep and trailer around. Mike was very impressed that I could back up the trailer. I said "I can back it up with the jeep but I can't back it up with the 4-wheeler".

We loaded the old gate onto the trailer and I headed up to the barn with it.


Sunday 3-8
What another great day. We have the door open and we are sitting at the kitchen table having our coffee and listening to the birds chirp. I can't wait to be sitting out on our deck and having coffee. Oh yeah, we have to build the deck first, lol.

Time to work. This time we have to go and fix the fencing that attaches to the pole for the front gate. Yesterday we did a quick fix. This old fence goes from the gate pole down the hill, across the creek, and up the hillside.

This is what the old fencing and wiring looks like.

And.

The old poles in the creek weren't even buried. They were being held up by the gobs of wire. We took it all out.

Next Mike pounded in 2 T-posts, one on each side of the creek, in a straight line with the gate pole.

Here I am "miss redneck in brown"(I mean no offense to anyone). Mike says "he owed me because I've taken bad shots of him for all of you to see, lol." I am putting in the eye bolts to hold the barbed wire. When you work with barbed wire you have to put on your worst clothes because you usually end up ripping them.

The eyebolts are in the pole and the fencing is attached.

We forgot to bring the barbed wire stretcher down. Back up to the house for a short break and to pick up the stretcher.

Here is Mike with the stretcher on the pole and the wire pulled through it.

The new fencing is tight and across the creek.

Next we go up to the barn and get a pole. Mike cuts it down and we wedge it into the ground under the wire. This time we want to keep the cows "in".

On our way back up to the house we unload the trailer into the burn pile. It's going to start growing really fast now.

Back at the house Mike "finally" put on our 2nd screen door. We really only use the one door so we weren't worried about it. Now with the nice weather I want to keep the house open as much as we can.

After dinner Mike, Niki, and I went for a walk. As we walked one of our easier sections we talked about clearing some big branches and some downed trees to make a nice walking path. Ah more work for our list. We love the outside work.

I hope this next week is as good as this past week. It felt great to be back outside and working. I hope you all enjoyed our story. 

Lisa

Chapter 50...Beefing Up My Pantry

Off Grid...Chapter 50

Hello everyone. I hope you all didn't get too much snow yesterday. For those of you who didn't we have plenty up on our mountain to share.


Monday 2-23

While Mike and I were eating breakfast we heard a crash and then another crash. Crashes are never good. It was coming from the kitchen so I started opening doors in the kitchen. I opened up the pantry door and sure enough two of the shelves with all my cans collapsed from all the weight, lol. We were hoping that the brackets that came with the pantry would be sufficient but I guess the cabinet company never planned on a lunatic like me stocking their pantry's.

Well on the plus side it gave us something to do and this time we did it right. First Mike and I went up to the building to get supplies to do the pantry right. It's amazing how much stuff you need for one little project. Once we got back down to the house I emptied the cans out of the pantry putting some in a big container and the rest all over the counter.

While I was doing that Mike started cutting strips of wood to use as side rails for the pantry. The side rails will hold up the shelves. We should have done this in the first place.

After the side rails were cut Mike put glue on them.

Then he glued and screwed them inside the pantry.

After he puts the 6 side rails in then the shelves can go back in.


Now I have a nice sturdy pantry.

I just have to wait 24 hours for the glue to dry and than I can put the cans back in.


Tuesday 2-24
We are still waiting for the glue to dry so we decide to make a dump run. Mike hooks up our old trailer to the jeep and we load up. Next we head over to our other property and we completely empty out all of our trash from the other building. We loaded up a combo washer/dryer which was originally from the coach and also the original mattress from the coach. Now the building is completely empty and ready to move. Now if we could just get the land to dry out.

At the dump Mike tells the guys about the washer/dryer and they want it which is good because we don't have to pay to dump it. They are getting a deal because inside the w/d is the instruction manual and it still works good.
It's just another thing off of our list and it will make someone happy.

When we get home I can finally re-organize my pantry, woo hoo. Everything is all nice and neat and I have a little room for more food. I better go shopping. If you haven't figured it out I am a food hoarder. At least Mike and I will never starve, lol.


Thursday 2-26
I went to town for another Dentist check in and also did a little running around. Poor Mike is stuck in the house with nothing to do.


Saturday 2-28
It's the last day of February we are very happy about it. We are supposed to get snow tomorrow so we head to town to pick up some of the basics in case we get snowed in.

Sunday 3-1
Happy March. Woo hoo only 3 more weeks until Spring. Unfortunately our welcome to March is mot a friendly one.

It is starting to snow.


By the afternoon it is almost a whiteout. We are now supposed to get 5-10 inches of snow. Oh no, we will never get down our driveway.

As much as we don't want to see anymore snow it really is beautiful. Here is the snow in the tree branches. I love this.



As beautiful as this looks we will be very happy if we don't see snow again until next winter. It's funny we have these little black birds that only come out when it snows. We haven't seen them in a couple of weeks or so. As soon as it started snowing they swarmed our birdhouse. They learned very fast where to come for the food in bad weather.

We did have to use the generator today to charge up our batteries. It looks like we can go about 4 days of clouds before we need some help. Mike thinks he will be able to improve this when he changes our system.

I hope you enjoyed our little update. 

Lisa