Florida Flip 2...New Kitchen Walls and Porcelain Tile
Hello everyone. It's time for another part of our story. This is the last work we did the first winter we were in FL. We weren't supposed to work on this house at all the first year Now that we have everything gutted we are ready for the new drywall and some of the finish work and painting The studs are up and the electric is in for the new kitchen walls. Mike and I hire out for the drywall and finish work. It is much easier and faster for people who do it all the time. Kevin starts hanging drywall in the new kitchen area. The kitchen walls are done. Kevin patching the ceiling. The bathroom walls are done. And the bathroom ceiling. The ceiling out in the main living area. Our new post that had to be installed for the electric that will go to the new kitchen island. The back of the new kitchen wall going down the short hallway to the laundry room. Another bonus of this house. The laundry room is inside Kevin spray texturing the ceiling. Kevin is done so it's time for Mike and I to work First Mike and I move our temporary kitchen into the master bedroom. We don't want anything in our way. We tape everything off and get started Mike spraying the ceiling. As usual I do the trim. Mike rolling the dining room area. We went back and forth on what kind of floor to do. The last house we did had a very thick warm carpet. This house we want to keep light and bright. We chose an 18" Italian porcelain tile for the main living area. And it's going to be a lot of work Mike mixing the thin set for laying the tile. Moving right along....and we need to move the refrigerator into the garage And one more thing has to be moved out of the room so we can finish I am spreading the thin set one of the last rows for the living room. And the work continues. We lay the tile in the remainder of the living area. It was a big job for us. I don't think Mike and I will do that again. After all of the tile was set with the thin set, we had to grout...the whole floor. Mike filling in some grout. And another view of the whole floor. Once it is all clean it will have a beautiful shine. That's all for this story. We are almost finished with the inside of the house. The hard stuff is done I hope you all enjoyed the story. Lisa |
Showing posts with label Remodel. Show all posts
Showing posts with label Remodel. Show all posts
Sunday, March 3, 2013
Florida Flip 2...New Kitchen Walls and Porcelain Tile
Solar, building
Drill,
Dry Wall,
Flooring,
Grout,
House Flip,
Kitchen,
Mixer,
Paint,
Paint Roller,
Paint Sprayer,
Remodel,
Tile,
Wall
Florida Flip 2...Bathroom Demo and Soldering Pipes
The Bathroom Demo and Soldering Pipes
Good morning. Mike and I are in the middle of building a big shed but I can write a quick story.
I will take you back to the second bathroom demo. We are gutting the entire bathroom down to the studs and starting over. Just a quick picture of Mike working in the laundry room. We need to take out the old appliances, replace them with new, and redo the room. Mike is working on the plumbing. Onto the bathroom. We have that beautiful very 70's avocado green bathroom. We asked around and no one wanted anything from this bathroom so the quickest way for Mike and I to gut it, is to break it apart. Mike is starting with the cast iron tub. These are just too heavy for us to remove in one piece so we have to break it apart. Mike using the ax to break it...and these tubs are stubborn. Taking a break and doing an easier job. The vanity. The vanity is almost out. Next is the toilet and to speed up the job Mike decides to just break it out. Mike cleaning around the toilet area...yuck!! I hate that job. And back to the tub Using a crowbar on the tiled wall. Mike carefully cleaning up the shattered pieces. If you ever break up a tub or tile be very careful. The pieces are very sharp and can cut you open. While Mike is in the bathroom working, I am taking out the tack strips in the small bedrooms. Mike working on the bathroom walls. After the tub and walls are out we have a huge mess to clean up. What else is new, lol? It has to get worse before it gets better. And more. Time to take out the soffit above the tub. And then the bathroom ceiling. Getting a little side tracked, lol. Mike is taking out the door jams on one of the bedroom doors. We will be replacing all the doors in the house. New door going into the laundry room/garage. Mike is back up in the small attic. We need to add a fan to the bathroom. Here I am using my new fun tool to take out the tile on the bathroom floor. Note....the fancy flip flops and socks Once the floor is out and we get cleaned up, it's time to work on the new tub. Mike needs to work on the plumbing for the tub. Mike soldering the end on the shower pipe. Soldering an elbow for the diverter for the shower. The diverter with piping in place getting ready to be installed. Prepping the pipe to be installed. The diverter is installed and there are no more leaks The new ceiling fan and vent in the ceiling. Of course I put the new insulation in. The new electric for the new bathroom fan. New window installed. And the tub is in place. The messy part is done. The house is prepped for new sheetrock. Time to call in a crew. They do it so much faster than Mike and I can. That will be next week. It is so nice when you get to the point of putting a house back together I hope you enjoyed this part of the story. Lisa |
Solar, building
Ave,
Bathroom,
Bathroom Vanity,
Bathtub,
Ceiling Fan,
Crowbar,
Door,
Flip House,
Insulation,
Plumbing,
Reciprocating Saw,
Remodel,
Shower,
Tack Strips,
Tile,
Toilet
Subscribe to:
Posts (Atom)















































