Off Grid...Chapter 122
This is our first story for 2012. Mike and I planned on spending the winter in FL in our last house. Well...we ended up selling that house on December 1 and we got bored staying at a campground
Saturday January 7- It feels so good to be back home. Niki once again was thrilled to be back home. I think it must be all the smells here that she likes Next on the list. My wonderful real electric refrigerator is not going to make it through the winter months without some help. Since we wanted to be as self sufficient as we can we thought we could go all electric. That worked fine for the spring through fall months but not now. Back to the drawing board, lol. We thought we could add more panels and batteries and we would be fine but without the hours of sunlight it doesn't work. So we had to order another refrigerator. This time we ordered and RV refrigerator which can run on both propane and electric. We will run it on propane in the winter and electric the rest of the year. Hopefully this is the best of both worlds. Aren't you glad you have us to test things out first? And finally. Mike has been researching windmills again. Although they don't give us a lot of power he found one that might work to give us a boost. He ordered that. Monday 1-16 It's time for a trip to town. It snowed all weekend and I told Mike we should only go if the driveway is clear. We have been so busy with other things that he didn't plow the driveway. Mike said it doesn't look bad. There are some snow drifts on the drive but we can get out. OK...let's try it. So in the Jeep we go. We get around the first and steepest part of the drive. OK so far so good. We get to the section that is shaded and we hit ice under the snow. Mike says "hold on" We ran into the UPS driver in town and he gave us our new windmill OK..time to go back home. It looks like a lot of the snow has melted so we start up the driveway. So far so good. We got past the place where we slid with no problem The curve where we slid backwards. And the Jeep is stuck. We grabbed as much out of the car as we could and walked back up to the house. Later that day, after the snow melted, Mike and I went back down to the Jeep with the tractor. He plowed and I shoveled some of the icy edges on the driveway. I got in the car and Mike attached the chains. He pulled me out and back onto the driveway. There was no damage to the Jeep 1-17 Today is rainy and dreary but at least there is no more snow on our driveway We got the refrigerator loaded up onto our trailer and got it home. This one is smaller than both our propane refrigerator and our electric one. Here is Mike taking it down on the hand truck. We got that into the house and that is on our list of things to work on. Since it is an RV refrigerator it can't be hooked up right away. Mike will have to do some thinking and figure out how to make a box for it and get it installed. So onto our next project. Mike want to move our water pump from the back closet outside. This way we will have more storage space inside the house. That is always a good things. I help him work on getting the pump outside. Next he will work on building an insulated box for it. For now we will keep it covered with blankets until he box can be built. Next I decide to do laundry and I learned something new which I will share with all of you 1-18 It is a very cold day so we drove into town to pick up a pantry cabinet. We are going to use it for one of the sides for our refrigerator. On top of that I got 30% off because of some damage to the door which I think I can fix 1-19 It's time for some pictures....finally Here I am sanding the 4x4 post so I can paint it. After I sand it, we bring the pole into the house and set it on buckets to work on it. Mike is drilling a hole in the pole adapter. We needed this piece to attach the new windmill to the square post. Fitting the pole adapter onto the post. Mike screwing the metal rod onto the pole adapter. Mike working on the wires. Mike sliding the wires into a long pipe which will be attached to the post. He also uses rubber tubing to protect the wiress as they come out of the pole. Mike drilling a hole in the pipe for to make room for the wires. Mike putting the wires through. Wires are in. In between all of Mike's work, I painted the post green to match the house. Attaching the wind generator to the post. Screwing down the pipe holding the wires to the post. She is ready to go. Hopefully Mike got the wires right Next we go up top to dig the hole to install the pipe. While Mike gets his tools together I start digging. Mike finishes up the hole. Both of us carry up the new wind generator and place it in the hole. Then we pack the dirt and some gravel around the post. Mike screws the post into the house. And it is done Another job done. Now let me explain about the changes and what we did with the wind generator. Our first wind generator was about the same size as far as blades go but it was only 200 watts and it needed a consistent 13.4 MPH to make electric. Our next wind generator had a much bigger blade size and put out 900 watts of power but it needed 28 MPH of consistent wind to turn the blades and produce power. We also installed that with the help of the backhoe and two taller poles which were connected in the middle. We never cared for that set up. We also don't want to have to call in "anyone" for any help if things need to be fixed or changed. So we decided to give this one a try. The blades are about the same size as our original one but it is 500 watts instead of the 200. It also only needs 8MPH of wind to produce electric. I know many people use towers and that is great if you want to rely on on other people to help you when things go wrong. Mike and I want to try and do it all on our own. We are slowly getting there and trying to improve as we hit our glitches. It takes time and learning to get it all right. Someday we all get there And for our final picture for this story. We had a pretty sunset that night. That's all for this week. I hope you all enjoyed our story and learned some things |
Showing posts with label Jeep. Show all posts
Showing posts with label Jeep. Show all posts
Monday, February 25, 2013
Chapter 122...Back Home and So Excited For 2012 Projects
Solar, building
4-wheeler,
4x4 Post,
Drill,
Hand Truck,
Jeep,
Niki,
Off Grid,
Pole Adapter,
Post Hole Digger,
RV Refrigerator,
Sanding,
Trailer,
Water Pump,
Wind Generator
Chapter 113...Taking An Inverter Apart and Replacing Parts & A New Bull
Off Grid...Chapter 113
June 1- Today was a mix of a day. First I had to take Niki to the vet. She hasn't been able to hold down any food in a few days Then Mike and I drove around and met and caught up with some of our old neighbors from our last farm. It was a good day..but no work got done. June 2- It is a sunny day which means it's time to do laundry June3- Today we took out the old washer and dryer and installed the new washer. I don't have a dryer now but at least our clothes will get clean. The rest of the day was a clean up round. June 5- Today we worked on the ditch line..I know it's getting old but we will get it done this summer Back in the rocks And we did pretty good. June 6- Mike wants to add an extra eave on the perimeter of our roof to protect the house from the weather. He also wants to have a metal piece made up to protect the new eave and the house. Today we went to the farm supply to order the new metal. We have to do the eaves and the metal before we can put the new shingles on. When we got back home we found a delivery. Our new inverter boards are here. Looks like Mike has some work to do. I will just be near him for moral support Here is the old inverter box with nothing inside. This is what it should look like. Here are the new parts I am so glad Mike can do this kind of work. Just looking at this makes me confuses me, lol. One of the boards. Mike starting to put the circuit boards into the case. Another board to put in. Mike putting it together. All three replacement boards are in Almost done. Putting the top back on. And screwing it back into place. And it's all done. Mike made it look so easy Next Mike takes the fixed inverter out to hook it up to our Jeep battery to test it. It's a good thing we did this today. Mike found out that our terminal end on the Jeep battery was cracked. See...some things do happen for a reason. We will have to pick one up next time we are out. And Mike using the volt meter to test the repaired inverter. Whew..it all looks good. Now we just have to send back the old parts to the company..who, by the way have great customer service. June 12- We woke up today and Mike says to me "we have a new bull". No way...when did that happen? Sure enough we have a new light colored bull. But we find out he's not ours...uh oh It turns into a very different day than planned. The cow people, Howard, Eric, and Ivalee show up to get this bull out. After a couple of hours of calling the girls, because the bull will follow, Eric gets the bull almost to the top of the ridge by the hole in the fence. Then something spooks the bull and he runs all the way back down the hill That's it for today. I will leave you with some garden pictures. My favorite. I love my little garden Soon you won't be able to see any dirt Here is my orphan garden. I didn't have room in my garden for all the zucchini and squash plants and I didn't want to throw them away. They are looking pretty good. Lisa |
Solar, building
Bull,
Cows,
Ditch line,
Garden,
Inverter Boards. Inverter,
Jeep,
Jeep Battery,
Niki,
Off Grid,
Rocks,
Volt Meter
Subscribe to:
Posts (Atom)




































