11-13-17
It's going to be a busy and productive couple of days.
First thing this morning we get the metal delivery for the slab:
Then the pest men show up to spray the slab before the concrete gets poured. This is to protect the building from Florida pests and termites:
And:
They really doused it on so the pad should be well protected.
Meanwhile Mike and I did some yard clean up....something we will be doing on and off for a very long time:
Pulling out a tump with the tractor. Love that tractor, lol:
The concrete crew shows up to put down the plastic and the metal and at the same time our trusses show up.
A little early but better than late:
The concrete company starts out by laying plastic over the entire slab:
Then they add the metal grid to beef up the concrete:
And:
They are done for the day and ready to pour tomorrow:
11-14-17
The first concrete truck is here and one of the crew is working on the footers:
Spreading it out:
Time to level off that section until the next truck arrives:
Second truck in and poured. Time to use the float and spread it out:
Mike putting in the anchor bolts to secure the frame to the concrete:
Using the trowel machine to finish and smooth:
Almost done:
We now have a slab. Tomorrow they will come back to cut the expansion lines....then it;s time for Mike and I to get to work on building:
Next up....getting trailers moved closer to the slab and getting lumber to begin the building.